Gobi Hummer Sut Shelve Designation Instructions


The shelve contingency be legalised before any make use of to have certain attachments are secure, as well as for evidence of Wear. Injustice of a rackor failure to observe a manufacit/rer ’s m?r action s as to installation, proper Connection and upkeep will blank any warranties that may be pragmatic by law.
1. Cosmetic Bag labeled #1 remove essence as well as press rubber protecting frame #1 upon to bottom of fairing #2.
2. Cosmetic Bag, labeled #2 re move c ontents and place black symbol conduct sere w #3 thru blac k washe r and afterwards thru fairing #2. Place fairing onto bracket #4 and attach black washer, lock washer as well as wing bulb finger tight usually. Attach all 4brackets though do not insert fairing to shelve at this time.
3. If a GOBI rooftiles shelve calls for 2? await brackets bom the front as well as back factory cross bars contingency be removed at this time. If a GOBI roof rack calls for 4? brackets mislay usually the rear cranky bar as well as slip a front cranky club #14 behind approximately 36? from the front of the roof track #15 as shown in Fig. 1 page 4 do not fully tighten down cross bar at mis time.
4. Cosmetic Bag labeled #3 remove contents and insert black “T” nuts #6 into roof tract sbt 6a to bom roof tracks #15 as well as space detached as shown in Fig. 2 page 4.
5. Cosmetic Bag labeled #3 mislay essence as well as place a rubber washer #7 upon to bureau roof lane container on top of any “T” nut both tracks.
6. Place support braeke t #8 in a di ree tio n shown in a illustrano n with small shaft ho les face d down onto rubber washer #7 and thread bolts, lock washers and washers #9 found in Cosmetic Bag, labeled #3 thru support joint #8 and into “T” bulb ff6. Make sure “T” nuts have been commissioned in car roof lane ?a rightly as shown in Fig. 3 page 4. Repeat mis step to all #8 support brackets and keep spacing of #8 await brackets as shown in Fig. 1 page 4. Finger tighten bolts at mis time.
7. After all #8 await brackets have been installed and spaced as shown in Fig. 1 page 4 place a GOBI reck #11 with welded-in brackets #1 la on top of all #8 await brackets.
8. After fixation the GOBI shelve #11 on top of the #8 await brackets slide the black rubber washers #10 found in Plastic Bag labeled #4 betwee n all 6 GOBI shelve welded-in brackets #11 the and the #8 await brackets. Install all #12 bolts, washers, close washers as well as nuts found in Cosmetic Bag labeled #4 as shown in a painting page 4 as well as f?nger tie at mis time.
9. Align shelve with car as well as tighte n all nuts and bolts sec urei y. Co mpletely tie factory back cr anky club during this time.

Get pdf Gobi Hummer Sut Rack Designation Instructions

Share
Tags: al, Designation, f6, HUMMER, Image, images,

Comments are closed.

Get Adobe Flash player