H3 Hummer Front Sand Ensure Designation Instructions


Spin the front wheels all the way to a left or right for mud guard designation. However, it may be necessary to remove a wheels depending upon a collection being used for installation.
1. Purify and degrease the sand guard location area on a fender before designation.
2. Remove existing fastener from location D (Figure 1).
3. Attach mud ensure to front buffer with “existing bureau fastener” during location D. Check fit and parallel as well as adjust accordingly before tightening (Figure 1).
4. Using sand guard as a template, symbol, drill 1/8 holes as well as implement #10 screws and washers at locations THE, B, and C

PORTRAYAL INSTRUCTIONS
1. Purify sand ensure with a soap and water resolution to remove dirt as well as other contaminates.
2. Sand painting surface with 320 courage silt paper.
3. Request a coating of flexible primer-adhesion upholder.
4. Request a flexible paint as directed by the paint manufacturer

PAINT INSURANCE FILM – INSTALLATION INSTRUCTIONS
NOTE: A Paint Protection Film is the precut template of film used to protect the mud ensure mounting surfaces of your fenders against wear. A templates (left and right side) can be private from the subsidy liner by folding a sh ip at a center cut of the template, separating a movie sides and peeling a movie templates from a subsidy ship.
1. Position sand ensure on fender to prove placement place of paint protection film.
2. Purify the placement area of fender with a purify cotton fine cloth as well as a petroleum distillate based cleaner such as DuPonts Prep-Sol Brand Well-off Cleanser or 3M Brand Adhesive Cleanser and dry.
3. Mix a wetting solution of 1 pint of water with 4 drops of glass dishwashing antiseptic.
4. Mark correct onallsides of film by placing mud ensure opposite buffer.
5. Mislay protection movie from ship as well as inundate adhesive side of film wi th wetting solution (use a spray bottle or sponge).
6. Entirely wet film placement place of fender with wetting solution.
7. Position the adhesive side of film on fender as well as flood with wetting resolution.
8. Check place of movie with sand guard and reposition as necessary.
9. Using a sponge, squeegee any air bubbles and wrinkles from film.
10. Concede film to dry before installing mud guard.

Get pdf H3 Hummer Front Sand Guard Installation Instructions

Share
Tags: al, Designation, dir, Front, HUMMER, manufacture, rtr, scr, xis,

Comments are closed.

Get Adobe Flash player